Most substrates are best prepared by cleaning with a 50:50 mixture of isopropyl alcohol (IPA)
and water* prior to applying 3M? VHB? Tapes.
Exceptions to this general procedure that may require additional surface preparation include:
? Heavy Oils: A degreaser or solvent-based cleaner may be required to remove heavy oil or
grease from a surface and should be followed by cleaning with IPA/water.
? Abrasion: Abrading a surface, followed by cleaning with IPA/water, can remove heavy dirt
or oxidation and can increase surface area to improve adhesion.
? Adhesion Promoters: Priming a surface can significantly improve initial and ultimate
adhesion to many materials such as plastics and paints.
? Porous Surfaces: Most porous and fibered materials such as wood, particleboard, concrete
etc. need to be sealed to provide a unified surface.
? Unique Materials: Special surface preparation may be needed for glass and glass-like
materials, copper and copper containing metals and plastics or rubber that contain
components that migrate (e.g. plasticizers).
*Note: These cleaner solutions contain greater than 250 g/l of volatile organic compounds (VOC). Please consult your
local Air Quality Regulations to be sure the cleaner is compliant. When using solvents, be sure to follow the manufacturer’s
precautions and directions for use when handling such materials.
General
Procedure
? To obtain optimum adhesion, the bondingsurfaces must be well unified, clean and
dry. Typical surface cleaning solvents are IPA/water mixture (rubbing alcohol) or
heptane.* (Steps A and B)
? Bond strength is dependent upon the amount of adhesive-to-surface contact
developed. Firm application pressure develops better adhesive contact and helps
improve bond strength. (Steps C and D) Generally, this means that the tape should
experience at least 15 psi (100 kPa) in roll down or platen pressure. (Sources- page #4)
? After application, the bond strength will increase as the adhesive flows
onto the surface. At room temperature,approximately 50% of the ultimate
strength will be achieved after 20 minutes, 90% after 24 hours and
100% after 72 hours. In some cases,bond strength can be increased and
ultimate bond strength can be achieved more quickly by exposure of the bond
to elevated temperatures (e.g. 150°F [66°C] for 1 hour).
PERCENT OF FULL BOND
Typical Bond Build Over Time
Step A:
Solvent wipe
Step B:
Wipe dry
Step C:
Apply tape to surface
Step D:
Roll finished joint