• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    3M VHB Surface原版資料

    下載次數:102 瀏覽次數:106發布時間:2016-11-07 10:54
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    Most substrates are best prepared by cleaning with a 50:50 mixture of isopropyl alcohol (IPA)

    and water* prior to applying 3M? VHB? Tapes.

    Exceptions to this general procedure that may require additional surface preparation include:

    ? Heavy Oils: A degreaser or solvent-based cleaner may be required to remove heavy oil or

    grease from a surface and should be followed by cleaning with IPA/water.

    ? Abrasion: Abrading a surface, followed by cleaning with IPA/water, can remove heavy dirt

    or oxidation and can increase surface area to improve adhesion.

    ? Adhesion Promoters: Priming a surface can significantly improve initial and ultimate

    adhesion to many materials such as plastics and paints.

    ? Porous Surfaces: Most porous and fibered materials such as wood, particleboard, concrete

    etc. need to be sealed to provide a unified surface.

    ? Unique Materials: Special surface preparation may be needed for glass and glass-like

    materials, copper and copper containing metals and plastics or rubber that contain

    components that migrate (e.g. plasticizers).

    *Note: These cleaner solutions contain greater than 250 g/l of volatile organic compounds (VOC). Please consult your

    local Air Quality Regulations to be sure the cleaner is compliant. When using solvents, be sure to follow the manufacturer’s

    precautions and directions for use when handling such materials.

    General

    Procedure

    ? To obtain optimum adhesion, the bondingsurfaces must be well unified, clean and

    dry. Typical surface cleaning solvents are IPA/water mixture (rubbing alcohol) or

    heptane.* (Steps A and B)

    ? Bond strength is dependent upon the amount of adhesive-to-surface contact

    developed. Firm application pressure develops better adhesive contact and helps

    improve bond strength. (Steps C and D) Generally, this means that the tape should

    experience at least 15 psi (100 kPa) in roll down or platen pressure. (Sources- page #4)

    ? After application, the bond strength will increase as the adhesive flows

    onto the surface. At room temperature,approximately 50% of the ultimate

    strength will be achieved after 20 minutes, 90% after 24 hours and

    100% after 72 hours. In some cases,bond strength can be increased and

    ultimate bond strength can be achieved more quickly by exposure of the bond

    to elevated temperatures (e.g. 150°F [66°C] for 1 hour).

    PERCENT OF FULL BOND

    Typical Bond Build Over Time

    Step A:

    Solvent wipe

    Step B:

    Wipe dry

    Step C:

    Apply tape to surface

    Step D:

    Roll finished joint

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    少妇中文无码高清| 久久久无码精品亚洲日韩蜜臀浪潮| 中国无码人妻丰满熟妇啪啪软件 | 人妻无码一区二区三区AV| 中文字幕日本在线观看| 国产精品无码专区在线观看| 亚洲不卡中文字幕无码| 免费无码国产欧美久久18| 久热中文字幕无码视频| 无码专区国产无套粉嫩白浆内射 | 精品人妻大屁股白浆无码| 国产亚洲大尺度无码无码专线 | 台湾佬中文娱乐网22| 久久精品无码一区二区app| 无码囯产精品一区二区免费| 国产成人无码一区二区三区在线| 日本中文字幕在线2020 | 精品人妻V?出轨中文字幕| 韩国中文字幕毛片| 中文文字幕文字幕亚洲色| 亚洲av无码专区在线观看下载| 欧洲无码一区二区三区在线观看| 亚洲精品色午夜无码专区日韩| 婷婷四虎东京热无码群交双飞视频| 欧美日韩中文字幕在线观看| 久久精品中文字幕一区| 国产高清中文手机在线观看| 欧美精品丝袜久久久中文字幕| 久草中文在线观看| 自拍中文精品无码| 国产激情无码一区二区三区| 国产品无码一区二区三区在线蜜桃 | 亚洲av日韩av无码| 无码国产精品一区二区免费式芒果| 亚洲AV无码一区东京热| 狠狠噜天天噜日日噜无码| 国产成人精品无码免费看| 国产午夜无码片免费| 无码精品人妻一区二区三区AV| 中文字幕专区高清在线观看| 亚洲日韩乱码中文无码蜜桃臀网站 |