• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    3M VHB Surface原版資料

    下載次數:108 瀏覽次數:115發布時間:2016-11-07 10:54
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    Most substrates are best prepared by cleaning with a 50:50 mixture of isopropyl alcohol (IPA)

    and water* prior to applying 3M? VHB? Tapes.

    Exceptions to this general procedure that may require additional surface preparation include:

    ? Heavy Oils: A degreaser or solvent-based cleaner may be required to remove heavy oil or

    grease from a surface and should be followed by cleaning with IPA/water.

    ? Abrasion: Abrading a surface, followed by cleaning with IPA/water, can remove heavy dirt

    or oxidation and can increase surface area to improve adhesion.

    ? Adhesion Promoters: Priming a surface can significantly improve initial and ultimate

    adhesion to many materials such as plastics and paints.

    ? Porous Surfaces: Most porous and fibered materials such as wood, particleboard, concrete

    etc. need to be sealed to provide a unified surface.

    ? Unique Materials: Special surface preparation may be needed for glass and glass-like

    materials, copper and copper containing metals and plastics or rubber that contain

    components that migrate (e.g. plasticizers).

    *Note: These cleaner solutions contain greater than 250 g/l of volatile organic compounds (VOC). Please consult your

    local Air Quality Regulations to be sure the cleaner is compliant. When using solvents, be sure to follow the manufacturer’s

    precautions and directions for use when handling such materials.

    General

    Procedure

    ? To obtain optimum adhesion, the bondingsurfaces must be well unified, clean and

    dry. Typical surface cleaning solvents are IPA/water mixture (rubbing alcohol) or

    heptane.* (Steps A and B)

    ? Bond strength is dependent upon the amount of adhesive-to-surface contact

    developed. Firm application pressure develops better adhesive contact and helps

    improve bond strength. (Steps C and D) Generally, this means that the tape should

    experience at least 15 psi (100 kPa) in roll down or platen pressure. (Sources- page #4)

    ? After application, the bond strength will increase as the adhesive flows

    onto the surface. At room temperature,approximately 50% of the ultimate

    strength will be achieved after 20 minutes, 90% after 24 hours and

    100% after 72 hours. In some cases,bond strength can be increased and

    ultimate bond strength can be achieved more quickly by exposure of the bond

    to elevated temperatures (e.g. 150°F [66°C] for 1 hour).

    PERCENT OF FULL BOND

    Typical Bond Build Over Time

    Step A:

    Solvent wipe

    Step B:

    Wipe dry

    Step C:

    Apply tape to surface

    Step D:

    Roll finished joint

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    无码人妻丰满熟妇精品区| xx中文字幕乱偷avxx| 激情欧美一区二区三区中文字幕| 中文字幕九七精品乱码| 精品无码人妻一区二区三区| 中文亚洲AV片不卡在线观看| 一本色道无码不卡在线观看| 人妻少妇无码视频在线| 亚洲欧美日韩中文字幕二区| 国产精品无码久久久久久| 日韩国产中文字幕| 国产在线无码视频一区二区三区| 色综合久久中文综合网| 人妻丰满av无码中文字幕| 国产日韩精品中文字无码| 无码国产69精品久久久久网站| 亚洲中文字幕无码日韩| 国产在线无码一区二区三区视频| 中文字幕在线观看免费视频| yy111111电影院少妇影院无码| 亚洲乱码中文字幕综合234| 亚洲&#228;v永久无码精品天堂久久 | 日韩久久无码免费毛片软件| 免费A级毛片无码A∨免费| 人妻无码中文字幕免费视频蜜桃| 国产AV无码专区亚洲AV手机麻豆| 精品久久久中文字幕人妻| 日韩国产成人无码av毛片| 久久精品中文无码资源站| 一本一道av中文字幕无码| 久久激情亚洲精品无码?V| 亚洲av无码成人黄网站在线观看| 中文www新版资源在线| 亚洲爆乳无码精品AAA片蜜桃| 无码人妻黑人中文字幕| 中文字幕国产视频| 日本中文字幕中出在线| 中文无码久久精品| 欧美日韩久久中文字幕| 亚洲乱亚洲乱少妇无码| 国产精品无码素人福利不卡|