• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好! [請登錄]   [免費注冊]
    x
    全部商品分類

    Bonderite_L_GP_333_Black_PTFE_Coating產品資料

    下載次數:154 瀏覽次數:474發布時間:2017-11-11 20:29
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    Surface Preparation

    Substrates must be dry and free of contaminants (dirt, grease, powder, and other

    residues)before application of Emralon 333. Excellent results can be obtained without pretreatment.However,

    for maximum wear characteristics the following pre-treatment’s are

    recommended:heat stable phosphate coating* or grit blasting for steel; grit blasting or heat

    stable conversioncoating for aluminum.

    Mixing

    Emralon 333 is supplied ready for use, but it should be mixed thoroughly by stirring. For

    bestresults, use a low speed propeller-type mixer. Do not vortex or agitate violently, as

    airentrapment or foaming may cause separation of solids.

    Application

    Emralon 333 is normally applied by spray techniques. An external atomizing type gun

    usingan MBC #30 nozzle is recommended. Optimum coating thickness is 0.001 inch

    (25.4microns). USE ONLY SB-3 SOLVENT FOR CLEAN-UP. Incompatible solvents will

    cause gunblockage. Emralon 333can be overcoated for repair purposes without removing

    the entireoriginal film. Sand lightly or use steel wool to feather the edges of the area to be

    repaired.Light abrasion of the surrounding areas is also recommended for maximum

    adhesion. Thenapply Emralon 333, using the same spray procedures as for the initial

    application. Follow thestandard cure cycle as stated below.

    Curing

    Emralon 333 may be cured by exposure to any of the time/temperature conditions

    indicated inthe following table. It is essential that the high boiling solvents in Emralon

    333be removedgradually before the cure is completed or the coating will be marred by

    blisters. Gradualremoval of the solvent can be accomplished by preheating the coating for

    ten minutes at149°C (300°F) or 177°C (350°F) before curing.

    For example, typical cure cycles are:

    SUBSTRATE TEMP/TIME SUBSTRATE TEMP/TIME

    (a) 149°C (300°F) 10 min.

    (b) 149°C (300°F) 10 min.

    (c) 149°C (300°F) 10 min.

    (d) 177°C (350°F) 10 min.

    (e) 177°C (350°F) 10 min.

    260°C (500°F)/ 15 min.

    288°C (550°F)/ 9 min.

    316°C (600°F)/ 5 min.

    371°C (700°F)/ 1 min.

    399°C (750°F)/ ? min. 

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    亚洲熟妇无码乱子AV电影| 午夜成人无码福利免费视频| 日韩av片无码一区二区三区不卡| 色综合久久最新中文字幕| 成在线人AV免费无码高潮喷水| 最近中文2019字幕第二页| 无码国模国产在线无码精品国产自在久国产 | 亚洲av无码国产精品色在线看不卡| 亚洲国产精品成人精品无码区| 亚洲AV中文无码字幕色三| 国产无遮挡无码视频免费软件| 无码人妻精品中文字幕免费东京热 | 中文一国产一无码一日韩| 波多野结AV衣东京热无码专区| 欧美日韩毛片熟妇有码无码| 人妻无码中文久久久久专区| 久久久精品人妻无码专区不卡 | 无码乱人伦一区二区亚洲一| 中文字幕无码高清晰 | 精品无码一区二区三区亚洲桃色 | 亚洲大尺度无码专区尤物| 无码国产精品一区二区免费式直播| 欧美日韩国产中文高清视频| 久久亚洲AV永久无码精品| 国产激情无码一区二区app| 久久精品aⅴ无码中文字字幕不卡| 无码日韩精品一区二区免费暖暖 | 日韩精品无码免费一区二区三区| 国产羞羞的视频在线观看 国产一级无码视频在线 | 中文字幕无码播放免费| 日韩免费a级毛片无码a∨| 亚洲av无码专区在线观看下载| 国产成人无码一区二区在线播放 | 久久久久无码精品国产不卡| 无码国产色欲XXXXX视频| 无码视频在线播放一二三区 | 亚洲熟妇无码八V在线播放| 人妻少妇看A偷人无码精品| 亚洲av无码成人精品国产| 天堂√中文最新版在线| 在线观看免费中文视频|