• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好! [請登錄]   [免費注冊]
    x
    全部商品分類

    LMS粉塵氣溶膠發(fā)生器原版使用手冊

    Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread la
    下載次數(shù):334 瀏覽次數(shù):579發(fā)布時間:2018-07-01 17:16
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    - Unpack the dust feeder.

    - Plug in the electrical line to standard 220-240 VAC outlet.

    - Note that the feeder tray slides freely on two nylon rails when the vertical lever pin is disengaged (lifted up) from the feeding chain.

    - Set the tray in position by inserting (push down) vertical lever pin between two links on the feeding chain at approx. 3 inch or more forward of the sprocket that turns the chain.

    - Since the dust will be spread evenly across the width of the tray, and the tray advances ~28 cm (~11”) in 10 minutes, it is necessary to mark on the tray where the dust will be placed; make a mark on one edge of the tray that rides on a nylon bar near the paddle wheel – designate this as the starting point (0) for dust placement. Turn on the tray feed toggle, allow 10 minutes for the tray to advance, then mark the tray again – about 28 cm back from the staring point - designate this as the stopping point (10) for dust placement.

    - Supply an air pressure line (720 Kpa max) to the air inlet fitting (1/4 FPT) located on the side of the unit.   Option: it may be desirable to connect a standard shut-off valve and/or a quick-disconnect fitting(s) at this air inlet for convenience.  

    - Dry-run the unit without dust on tray to check unit operation:  with electricity & 700 Kpa at air inlet, turn on toggle switches first for TRAY FEED, then PADDLE WHEEL, then ASPIRATOR, and ascertain that tray moves slowly, paddle wheel rotates with wheel guard down, and that forced air comes out of the delivery tube.  

    OPERATION

    - Set the line pressure to 600 Kpa (for ASHRAE usage the airflow is 14.5 scfm and pressure should be set accordingly to achieve this flow rate). Refer to section 5.4 in the ASHRAE 52.1 procedures.

    - Connect the air outlet of the delivery tube to your test air duct. 

    - Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread layer between the two start/stop marks (0 and 10 min.) on the tray.  Depending on the flow rate of the filter under test, the amount of dust needed equates to 2 grams of dust per 1000 cfm of air flow in the duct per minute of dust feed.

    ?

    我們營業(yè)的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯(lián)系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發(fā)區(qū)章基路189號科創(chuàng)基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網(wǎng)站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    日本中文字幕高清| 日韩人妻精品无码一区二区三区 | 国产成人无码AV麻豆| 日韩精品中文字幕无码一区| 天堂网www中文在线| 亚洲一区二区三区AV无码| 亚洲无码黄色网址| 亚洲AV中文无码乱人伦下载| 亚洲欧美综合在线中文| 中文字幕无码无码专区| 中文字幕一区二区人妻性色| 无码GOGO大胆啪啪艺术| 日本久久久精品中文字幕| 人妻精品久久无码专区精东影业| 亚洲va中文字幕无码久久不卡| 无码中文字幕av免费放dvd| 中文人妻无码一区二区三区| 无码成人一区二区| 无码国产精品一区二区免费虚拟VR| 国产无码一区二区在线| 无码人妻精品一区二区三区99性 | 中文字幕精品无码一区二区 | A狠狠久久蜜臀婷色中文网 | 丝袜熟女国偷自产中文字幕亚洲| 亚洲AV无码一区东京热久久| 亚洲VA中文字幕无码一二三区| 久久久无码精品亚洲日韩按摩| 无码人妻少妇久久中文字幕| 中文字幕乱偷无码AV先锋| 久久久久亚洲av无码专区喷水 | 精选观看中文字幕高清无码| 国产又爽又黄无码无遮挡在线观看| 无码乱肉视频免费大全合集| A狠狠久久蜜臀婷色中文网| 无码人妻丰满熟妇啪啪 | 熟妇人妻不卡中文字幕| 无码AⅤ精品一区二区三区| 国产在线无码一区二区三区视频| 亚洲中文字幕无码一区| 一本本月无码-| 国产精品99久久久精品无码 |