• <button id="66kmq"><dl id="66kmq"></dl></button>
    <table id="66kmq"></table>
  • <li id="66kmq"></li>
  • <code id="66kmq"></code>
  • <code id="66kmq"></code>
    歡迎來Nano電子商城!
    您好 [請登錄]   [免費注冊]
    x
    全部商品分類

    LMS粉塵氣溶膠發生器原版使用手冊

    Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread la
    下載次數:322 瀏覽次數:561發布時間:2018-07-01 17:16
    允許查看的會員等級:非會員   普通會員   高級會員   VIP會員   

    文檔詳情

    - Unpack the dust feeder.

    - Plug in the electrical line to standard 220-240 VAC outlet.

    - Note that the feeder tray slides freely on two nylon rails when the vertical lever pin is disengaged (lifted up) from the feeding chain.

    - Set the tray in position by inserting (push down) vertical lever pin between two links on the feeding chain at approx. 3 inch or more forward of the sprocket that turns the chain.

    - Since the dust will be spread evenly across the width of the tray, and the tray advances ~28 cm (~11”) in 10 minutes, it is necessary to mark on the tray where the dust will be placed; make a mark on one edge of the tray that rides on a nylon bar near the paddle wheel – designate this as the starting point (0) for dust placement. Turn on the tray feed toggle, allow 10 minutes for the tray to advance, then mark the tray again – about 28 cm back from the staring point - designate this as the stopping point (10) for dust placement.

    - Supply an air pressure line (720 Kpa max) to the air inlet fitting (1/4 FPT) located on the side of the unit.   Option: it may be desirable to connect a standard shut-off valve and/or a quick-disconnect fitting(s) at this air inlet for convenience.  

    - Dry-run the unit without dust on tray to check unit operation:  with electricity & 700 Kpa at air inlet, turn on toggle switches first for TRAY FEED, then PADDLE WHEEL, then ASPIRATOR, and ascertain that tray moves slowly, paddle wheel rotates with wheel guard down, and that forced air comes out of the delivery tube.  

    OPERATION

    - Set the line pressure to 600 Kpa (for ASHRAE usage the airflow is 14.5 scfm and pressure should be set accordingly to achieve this flow rate). Refer to section 5.4 in the ASHRAE 52.1 procedures.

    - Connect the air outlet of the delivery tube to your test air duct. 

    - Weigh out and apply ASHRAE 52.1 dust in the tray and distribute the dust in a thin, evenly-spread layer between the two start/stop marks (0 and 10 min.) on the tray.  Depending on the flow rate of the filter under test, the amount of dust needed equates to 2 grams of dust per 1000 cfm of air flow in the duct per minute of dust feed.

    ?

    我們營業的時間9:00-18:00

    • 技術
    關閉在線客服

    Nano電子商城微信公眾號手機商城 Nano電子商城微信公眾號二維碼

    手機商城           微信商城

    任何購物問題請聯系納米科技(香港)有限公司  | 江蘇省蘇州市昆山開發區章基路189號科創基地2號樓202室 Tel:021-52069907 email: 19mro@19mro.com

    工作時間:周一至周五 8:00-18:00; 網站備案號 :滬ICP備12049383號; Copyright?2009-2012 19mro.com 版權所有 


     
    中文字幕无码久久久| 亚洲国产av无码精品| 日本精品久久久中文字幕| 久久精品无码一区二区无码| 亚洲国产中文字幕在线观看| 中文字幕精品亚洲无线码二区 | 日无码在线观看| 人妻精品久久无码专区精东影业| 无码国产精品一区二区免费式直播| 中文字幕乱码无码人妻系列蜜桃| 久久久无码人妻精品无码| 亚洲一区爱区精品无码| 国产资源网中文最新版| 中文字幕丰满乱孑伦无码专区 | 亚洲国产精品无码久久一线 | 亚洲va无码手机在线电影| xx中文字幕乱偷avxx| 天堂8а√中文在线官网| 久久受www免费人成_看片中文| 人妻无码精品久久亚瑟影视| 国产真人无码作爱免费视频| 久久精品国产亚洲AV无码麻豆| 亚洲AV无码精品色午夜果冻不卡 | 熟妇人妻系列av无码一区二区| 久久综合中文字幕| 亚洲高清中文字幕免费| 无码专区6080yy国产电影| 午夜成人无码福利免费视频| 成人无码区在线观看| 日韩AV无码不卡网站| 久久久久亚洲AV无码专区网站 | 国产成人亚洲综合无码| 精品国产毛片一区二区无码 | 久久久久久久久久久久中文字幕| 中文字幕色婷婷在线视频| 人妻中文字幕乱人伦在线| 最近2022中文字幕免费视频| 亚洲日韩中文在线精品第一| 中文字幕无码日韩专区| 无码国内精品人妻少妇蜜桃视频| 国产亚洲精品a在线无码|